Thank you for standing by. My name is Jeannie and I will be your conference operator today. At this time, I would like to welcome everyone to the Q 3/20/24 Nysource Earnings Conference Call. All lines have been placed on mute to prevent any background noise. After the speaker's remarks, there will be a question and answer session. If you would like to ask a question during this time, simply press * followed by the number one on your telephone keypad. If you would like to withdraw your question, press *1. Again, we do request for today's session that you please limit to one question and one follow up. Thank you. I would now like to turn the conference over to Chris Turner, Head of Investor Relations. You may begin.
Chris Turner (Head of Investor Relations)
Thank you. Good morning and welcome to the Nice Horse third Quarter 2024 investor call. Joining me today are President and Chief Executive Officer Lloyd Yates, Executive Vice President and Chief Financial Officer Sean Anderson, Executive Vice President of Strategy and Risk and Chief Commercial Officer Michael Lures and Executive Vice President and Group President, Nice Horse Utilities, Melody Birmingham. The purpose of this presentation is to review NICE sources financial performance for the third quarter of 2024 as well as provide an update on our operations and growth drivers. Following our prepared remarks, we'll open the call to your questions. Slides for today's call are available in the Investor Relations section of our website. We would like to remind you that some of the statements made during this presentation could be forward-looking. These statements are subject to risks and uncertainties that could cause actual results to differ materially from those expressed in the statements information. Information concerning such risks and uncertainties is included in the risk factors and MDNA sections of our periodic SEC filings. Additionally, some of the statements made on this call relate to non GAAP measures. Please refer to the supplemental slides, segment information and full financial schedules for information on the most directly comparable GAAP measure and a reconciliation of these measures. I'd now like to turn the call over to Lloyd.
Lloyd Yates (President & CEO)
Thank you, Chris, and good morning, everyone. I'll begin on Slide 3. The Night Source investment thesis is simple. We serve our customers by delivering safe and reliable energy and affordable value. Affordable energy requires efficient capital deployment, safe asset operations and constructive regulatory recovery mechanisms. These fundamentals generate competitive returns while enhancing our balance sheet position. Importantly, these are the foundation to the Nice Source business plan, which continues to offer compelling value to stakeholders driven by regulated utility operations across 6 highly constructive jurisdictions, offering diversification across fuel type and regulatory location. Strong execution from our team and these business fundamentals are what have driven A trailing 12 month 9.9% earned Roe at the Nice Source level, demonstrating our focus on shareholder returns despite rapidly growing deployed capital and declining financial leverage. This is a gap number with an adjustment made only to normalized weather. All of this informs our long term value proposition which our teams continue to advance each quarter. But before we focus on the long term plan refresh, let's turn to slide four and touch on the progress our teams have made on our regulatory activity. Being a trusted energy partner and enhancing nice sources, superior regulatory and stakeholder foundation is a priority and we believe differentiates us from peer regulated utilities. We remain active in rate case and tracker filing and build our credibility through our six state footprint by utilizing A stakeholder focused mindset as we approach these processes. Last month, an administrative law judge in Pennsylvania recommended the Commission approve our general rate case multi party settlement as filed in October, we reached the settlement in our Kentucky general rate case. Approval of both these settlements is subject to final Commission approval. In Indiana, we received approvals for both our solar CPC and amendments to add full ownership of solar facilities as well as the CPC and they constructed gas peaking facility, all of which helped nice source retirees remaining coal generating stations by the end of 2028. We also received approval to advance our strategy of using technology to more efficiently serve our customers to an upgraded work and asset management system which utilizes data and analytics through AI to raise productivity and efficiency across the dispatch of our operations team. This includes deferral for a one time in ongoing expenses and capital returns for the program which went live in July for our electric operations and we'll go live next summer for our gas operations. This new technology is also an example of making strategic investments to better inform our culture and enhance risk management across the systems to deliver operational excellence for our customers. Our relentless focus on operational excellence enhances our risk management posture and drives protection for our customers, communities and shareholders through our capital allocation framework. We face many potential categories of risk, which constantly evolve and risk management is central to our values. The utility industry continues to face potential challenges head on, whether it relates to natural disasters, the interest rate environment, inflationary pressures on cost structures or other items of uncertainty. Our teams are constantly implementing proactive solutions to add layers of protection into our plans and lead industry partners to understand and utilize best practices to de risk our execution and deliver our commitments. We have high confidence in our ability to achieve our financial commitments, which we believe are highly executable. We are reaffirming 2024 adjusted EPS guidance of $1.70 to $1.74 and we continue to expect to achieve the upper half of this range. We are initiating 2025 adjusted EPS guidance of $1.84 to $1.88 consistent with maintaining our existing 6 to 8% annual growth commitment. Today, we are also announcing a refresh of our outlook across our five year planning horizon and extend this commitment and our overall financial guidelines to 2029. Key elements of that plan included an updated five year capital plan which is $19.3 billion or equivalent to 89% of our total current rate base. This is slightly larger than our prior plans 87% of the year end 2023 rate base. This drive 8 to 10% rate base growth over the 2025 to 2029. Which fuels our ability to increase our adjusted earnings per share growth rate by 6 to 8% annually. Our investments and strengthen the balance sheet support our commitment to target FFO to debt of 14 to 16% in all years of the plan. Our work does not stop at the base capital plan. We are fortunate to have a robust portfolio of valuable customer investments conclude and extend far beyond our five year plan horizon, which Sean will detail later. Our teams remain active in developing this portfolio of projects to meet our standards necessary to be included in our base plan. One example of work by our teams is the development of our strategy to serve their robust interest by data center customers for power to be served by NIPSCO. The fundamentals of the Northwest Indiana region are compelling to potential data center customers. Access to critical infrastructure, including a robust transmission system and proximity to critical fiber connections, predictable climate and weather with low natural catastrophe risk and a constructive business climate including favorable tax structures, low cost land and a supportive state government are all favorable factors in advancing development of data centers in the region. Our teams are working to evaluate this build out, which could provide benefits to our existing system customers, enhance our communities and local tax base and provide compelling investment opportunities for our shareholders. Northwest Indiana is your premier location for data centers to locate. Simply put, there's potential for substantial value creation for all stakeholders and checking all of these boxes is important and I source. Now let's focus on the core execution our teams continue to to deliver upon with our regulatory engagement over the last three years detailed on Slide 5. During the trailing 12 month period ending last month, our average residential gas bill declined 16% on a total bill basis. Affordability remains a key priority for both NIPSCO and the Columbia Fam family of companies, and we continue to be thoughtful about this as we advance to critical safety, compliance and reliability work necessary to deliver safe and reliable energy to our customers. In September, NISCO filed its first electric general rate case in two years, driven by nearly $2.5 billion of incremental investment for our customers and communities in Northern Indiana. The case incorporates the Plan 2025 retirement of Units 17 and 18 at the Schaefer Generating Station, as well as 4 new solar and storage projects now reflecting Nisco's full ownership. Major investments such as these are examples of our continued partnership with state policy makers, regulators and customers. Switching to Pennsylvania, we expect a final Commission order and a new rate implementation in December. In Ohio, $285 million of investment was approved in August for our capital expenditure program rider and we expect to submit for two major capital riders in the state again early next year. In Virginia, intervener testimony was filed in October for our general rate case and a final order is expected early next year. Before I turn the call over, I want to thank all of our employees and contractors for their dedication to an Eyesource values doing things safer, better, more efficient and for less calls. Our customers and shareholders alike rely on you every day. I'll now turn things over to Michael.
Chris Turner (Head of Investor Relations)
Thank you, Lloyd. Good morning. We continue our discipline and methodical approach developing and effectuating A robust pipeline of investments to benefit stakeholders. I'll begin on slide six with an update on our generation investments. As Lloyd mentioned, there has been substantial progress made related generation investments that will benefit all stakeholders. With Gibson and Fairbanks having received regulatory approval for full ownership in August, we have now converted 4 projects to full ownership, which will materially lower cost to customers. In addition, we have progressed well in bringing our renewable assets into service. The 200 MW Cavalry Solar project with 45 megawatts of storage was placed in service in May and we expect the 435 MW Dunsbridge 2 solar project with 56 megawatts of storage to come online very early next year. Fairbanks and gifts and are expected to be in service later in 2025. With no changes to timeline since our last update, 100% of modules for Fairbanks are already on site and Gibson is expected to have all modules delivered by early Q12025IN continuing the work of maximizing the benefits of our assets for customers, NISCO filed a notification earlier this week with the IURC that an application will be filed requesting to convert the 200 MW Templeton Wind Energy Center in Benton County, Indiana, which was approved by the IURC of the PPA to a bill transfer agreement in which NIPSCO will own the asset upon completion. If approved, it will reduce customer cost versus the PPA structure at a valuable wind property to our generation portfolio and increase shareholder investment. It is a great example of the Nice Source team at work creating a win for all stakeholders. The projects on slide six are the result of the 2018 and 2021 NIPSCO integrated resource plan and corresponding RFP processes. These projects represent billions of dollars of economically driven investment in the state of Indiana, the majority of which are already delivering 0 commodity costs, solar and wind, driving down fuel related charges to customers. Please turn to Slide 7. On Monday, the NISCO team held the fifth and last stakeholder meeting in the 2024 IRP process. Potential incremental generation needs for the planning horizon are driven by three key factors, new EPA fossil fuel regulations, MISO reliability rules and data center demand. As most of you are aware of the EPA greenhouse gas standards and fossil fuel fire power plant guidelines finalized earlier this year may limit, may limit capacity factors require carbon sequestration investments or hydrogen utilization for gas generation capacity. Additionally, Miso's four season capacity construct and the reduction in capacity accreditation under the direct loss of load market design will have a substantial impact on generation requirements in the MISO footprint. These changes combined with a significant and growing interest in data centers in Nisco supports our IRP reference case, which includes these rule updates and 2600 megawatts of the of data center demand. We intend to file the final IRP at the IRC in December. As we work through the major changes to electric demand, we are evaluating the most customer beneficial glide path and our 2030 interim commitment. As we move towards our 2040 net zero goal, environmental objectives remain an important component of our overall company priorities and we have made significant progress with more than a 70% reduction relative to our 2000 and five CO2 baseline. And we will continue to balance customer cost, reliability and pace of these investments to meet these goals. On Slide 8, you'll find an overview of capital opportunities not included in our base or upside financial plans. These items are under development by nice source, strategy and commercial teams to build the business cases to advance these opportunities for stakeholders. To highlight the breadth of opportunities we have and are developing, I will highlight two disparate examples, data and analytics employing AI and data center work. As Lloyd mentioned, we have made real progress in the strong and effective deployment of technology upgrades, but we have also been building data and analytics capabilities utilizing AI. We have built, tested and are now deploying work management utilizing AI with our gas operations and we have already seen significant improvements enabling operational goals, lowering cost, increasing CapEx deployment efficiency and de risking our operations. At the other end of the spectrum, our data center deal team is meeting with qualified counterparties to understand their business models and needs. As we develop structures for NISCO to support data center generation and transmission needs while ensuring reliability for the region and protecting existing customers. We are actively working to enable access to the speed consistent with the data center demand profile. Fortunately, NISCO has a very strong infrastructure network and sites which have sound technical fundamentals for generation and transmission build out within the time frames beneficial to data center development. So that we have not included any data center activity within our plans or upside. We continue to focus on developing and vetting potential opportunities that would be beneficial to existing customers, shareholders, data centers and our communities. As mentioned when we started, we will develop these opportunities in a methodical and disciplined manner just as we've done with the Templeton Wind project. Sean will touch on more of that next. Sean.
Jeannie (Operator)
Thank you, Michael. Let's start on slide nine. Third quarter adjusted EPS was $0.20 per share, an increase of 1 penny versus the same. One year ago. Higher rate based investments drove $61 million in incremental revenue and net financing benefits of approximately $26 million were also realized on a year over year basis. Customer count and usage also added $2.6 million across our electric and gas businesses versus last year and have grown over $28 million total for the year. Moving to slide 10, let's breakdown our CapEx plan through 2029. As Lloyd mentioned earlier, we've refreshed our five year plan outlook, which starts with a base capital plan of $19.3 billion. The enhanced base plan is $2.9 billion larger than our prior base plan, which is driven by a number of factors including increased generation investments, gas compliance and system hardening projects and investments to modernize our information technology systems. As Michael shared, the base plan now reflects the inclusion of the Templeton project, which shifted from our upside plan into our base plan after our teams reached commercial agreement on the ownership of the project. We have enhanced our disclosure on the new base plan to detail the investment themes we are seeing as necessary to deliver safe and reliable service to our customers. All of these investments have met our threshold to be included in the base plan, mainly based on socialization with stakeholders, compliance and safety requirements and commercial structures at an affordable value. We've also spent time refreshing the portfolio of projects in the upside plan. Those that are teams are actively working on flowing into the base plan. The revised upside plan now sits at $1.8 billion and we've included an estimation of when those projects may become viable in our CapEx charts. Despite not yet being included in any of our base capital guidance or plans, the $1.8 billion upside category is slightly larger than our previous upside figure. It now consists of electric modernization, Sims a compliance and legacy plastic and gas systems work as well as additional costs for MISO Tranche One projects. We continue to see increased demand for investment in our systems to deliver the growth and system capacity our stakeholders require while in alignment with the necessary operating standards. Once these projects meet our threshold to be included included in the base plan, we will flow these through our full plan and provide updates along the way. I'd note here that the base and upside capital expenditures plans do not include any data center investment activity, which Lloyd and Michael highlighted earlier. We believe strongly that the data center strategy represents A compelling opportunity for NICE source. However, additional development of the strategy is required to meet our threshold to include in either the base or upside capital plans. With that said, the company is strongly positioned to advance the strategy. Continued execution on our financial commitments has strengthened the financial profile of the company, including its balance sheet positioning, which enables nice source to be opportunistic and capital allocation decisions. The constructive regulatory backdrop in Indiana supports utility centric regulatory compact and the vertical integration of the business model minimizes complexity for customers and regulators while providing flexibility around cash flow recovery. Nysource has deep access to capital markets and maintains flexibility to efficiently finance data center opportunities. Nysource also has a long standing history of supporting large load customers in the steel industry and has experience working with large customers to deliver value for all stakeholders. Let's move to Slide 11. We are pleased to report that we have priced $600 million in common equity through our forward ATM structure, completing our stated guidance for 2024 along with the junior subordinated notes issued this year. We've continued to strengthen the balance sheet positioning of the company despite the increase in capital expenditures included in our revised base capital plan. We do not expect changes to our financing plan and continue to target 14 to 16% FFO to debt in all years of our plan. Using a balanced mix of cash from operations, new long term debt and 200 to $300 million of annual maintenance equity to maintain our capital structure through the use of our at the market program. Limiting regulatory lag and sequencing our capital expenditures through efficient capital recovery mechanisms including capital trackers and forward-looking rate mechanisms help Nysores minimize delays in recovery of capital deployed. Approximately 81% of our new base capital is expected to begin recovery inside 12 months, which fuels reasonable returns of capital and minimizes the need for new equity. This is the same strategy which is enabled NYSORES to achieve the 9.9% trailing 12 month enterprise Roe which Lloyd highlighted and which helps us use cash, cash flow returns from the business to fund growth in the CapEx plans. Of note, we will continue to be opportunistic in the junior subordinated debt marketplace to strengthen the position of our F affoded debt as needed throughout our planned horizon. On slide 12, you'll see our our updated long term financial commitments. The new base plan drives 8 to 10% rate based growth over the five year. And continues our guidance of achieving annual adjusted EPS growth of 6 to 8% across each year of the plan reflecting out through the 2029. The value of this is notable. As you know we rebase long term EPS growth guidance off of actual results and out performance will flow through the full plan and compound when incorporating our growth rate. For example, as we initiate 2025 guidance of $1.84 to $1.88, the midpoint of this range is $0.10 per share higher than was estimated in our 2022 Investor Day, driven by outperforming the midpoint in all years of our plan. And this midpoint is 9.4% above the original midpoint when we initiated guidance for 2024. We are reaffirming our guidance of $1.70 to $1.74 for 2024 and again expect to achieve results in the upper half of this range. Additionally, we remain committed to 14 to 16% FFO to debt in all years of the plan. As was the case with our prior plan, the upside CapEx category is not required to drive any of the financial commitments shown in the upper center box and we will flow through any impacts associated with increases to our base case capital plan from the upside plan when those projects meet our standards. To be included. I'd note we remain focused on minimizing the financial impact that our safety, reliability and compliance work has across our customer base. Efficient projects like the Templeton Wind Energy Center enable an increase in CapEx plans while reducing the plan cost to customer and eliminate fuel costs for this portion of generation. A revised plan projects less than 5% average annual bill increases across night source. I'll conclude with highlights of our growing track record on slide 13. Our financial commitments are on track for 2024. We have established guidance for 2025 and remain confident in our near term and long term guidance, remains resilient to market and forces outside our control and are based on realistic and executable assumptions. Settlement Center PA and Kentucky rate cases and approvals for numerous Indiana generation and technology investments_our execution of recovery for critical investments to ensure safety and reliability of our systems year. To date financing activity has been completed and the diversification utilized in the junior subordinated debt marketplace demonstrates our balance sheet flexibility and continues to fortify our balance sheet positioning lastly. Our base and upside CapEx Plans demonstrate both programmatic investment plans and accelerated investment opportunities for customers and investors. To reiterate, our rate base and adjusted EPS guidance include neither the upside CapEx nor any data center load or investment and are built upon the known and socialized regulatory programs, which have contributed to the 8.1% adjusted EPS growth rate we've executed since 2021. The value proposition Eyesource continues to offer investors is diversified and regulated utility assets with the opportunity to invest in both programmatic gas infrastructure and the long term energy transition story of a fully integrated electric business. These elements have been core to our story for some time, but the emerging opportunity to support economic development on shoring and new data center development truly differentiate our value proposition relative to many alternatives in the market today. I'd now like to turn the call over to the operator for Q&A. Thank you. The floor is now open for questions. If you have dialed in and would like to ask a question, please press *1 on your telephone keypad to raise your hand and join the queue. If you would like to withdraw your question, simply press *1. Again, if you are called upon to ask your question and are listening via loudspeaker on your device, please pick up your handset and ensure that your phone is not on mute when asking your questions. Again, we do request for today's session that you please limit to one question and one follow up.
Jeannie (Operator)
Your first question comes from the line of Nate Capanello with Barclays. Please go ahead.
Lloyd Yates (President & CEO)
Hey, good morning. Morning, Nick. Hey.
Unknown (Analyst)
Good to see everything playing out from the Analyst Day here. So Congrats on that. So hey, so in your prepared remarks, you know, you kind of talked about you're having discussions continuing with data centers and you know, I understand that the recent increase in CapEx was largely just on, on the gas side, it seems. So just can you kind of talk about what the, the the catalyst that we should be watching for for you to kind of layer in those opportunities? Is it getting through a Nisco rate case? Is it finishing those discussions on what the tariff looks like and what would the timing of that be? Thank you.
Lloyd Yates (President & CEO)
So I'll start and I'll let Michael Lures provide more detail. You know, Nisource sees data center opportunity as just a really good incremental investment opportunity. But I think for the company where we are now, it's primarily a 2025 activity. I think as we progressed in discussions with some of the counterparties, we want to kind of get down to the detail and make sure that we do this in a discipline methodical way. And that's take that's just going to take time. You know, you think about what we just with Templeton win the win project, I mean our, our ability to do things in a discipline methodical way has been probably one of the keys to why we've been executing so well. So Mike, anything to add to that?
Chris Turner (Head of Investor Relations)
No, you hit a Lloyd, it's we are going to work through these opportunities in a manner as you said discipline and methodically make sure.
Unknown (Analyst)
We're providing the benefits to existing customers that it's accretive for shareholders. And then as we come through those opportunities at which point they, you know, are accretive or we know that they're beneficial, we will bring them forward just as we did with the Templeton One project today. OK. So is it the right take that these are you know truly incremental to the plan that the balance sheet can absorb it and that the customer rates can absorb it? And maybe maybe you can kind of just clarify on, you know, if you if you raise CapEx from here, does that require additional equity financing? Thanks.
Jeannie (Operator)
Yeah. Dick, just to be clear, the $19.3 billion capital plan is fully financed through all the systems that we've shared with you today. The $1.8 billion of potential upside CapEx may require modest amounts of equity based on the cash flow profiles of those projects when they get sequenced and how it would work through the regulatory mechanisms themselves. The incremental investment opportunities are not captured in any of those systems that I just highlighted. Well, that's where data center investments would theoretically live. Therefore, we wouldn't have to re evaluate everything to incorporate incremental investment opportunities through our systems. But we don't need a full planned refresh to do that. We'll flow those through our systems, and you'll know those when we know those through this mechanism.
Unknown (Analyst)
All right. Have a great day. Thanks.
Jeannie (Operator)
Your next question comes from the line of Julian de Moulin Smith with Jeffries. Please go ahead.
Unknown (Analyst)
Hey, a good morning team. Very well done. Truly impressive that those are not your average LDC's, I got to say. In fact, to that end, good morning team. To that end, just to understand the staggering of of different data points here, I mean just impressive CapEx update here, the 1.8 billion upside here. I mean you're going to get a number of these data points over the next year. That's not something we should be looking to with four Q, that's going to be a year out. The AI data center related data points here. Given the December IRP, that's a four Q update, presumably correct.
Jeannie (Operator)
Yeah, let let me just step through it real quick. So the $1.8 billion of upside CapEx, you can actually see it in the capital allocation buys that we shared. But to your point, we don't see much upside CapEx in 2025, but we do see some start to emerge in 20262027 and you can kind of see it layered in. We'll we'll continue to move those around on those bars based on the the the profile and the development of those projects. As we know more, we'll update that CapEx allocation on where those upside opportunities might land. And then in terms of updates, the IRP teams are clearly working through the preferred portfolio and what it takes to action those. Likewise with data centers well underway and under development, I imagine both are pretty significant strategies for the company. Therefore, I imagine we'll we'll discuss those on the the four Q call, but I don't know yet what the outlook will be and how those will be incorporated. Again, we'll need to do the commercial development and understand the value creation for all stakeholders. Once we understand that and roll that through the systems, we'll post it here on the call.
Unknown (Analyst)
Got it. Excellent guys. And if, if I may, can I open up the can of worms around the details of this, this you know the the the data center proposal here, right? You've got the various different iterations here, but the base 2.6 gigawatts here as you talk about, I mean, is there any kind of thought process that you'd walk through? I mean, I know you can put basic dollar per kilowatt assumptions, maybe some baselines on on what you historically owned and anything that you'd OfferUp as as initial observations to start to translate, you know, this kind of a number here, if you will in a little more detail.
Lloyd Yates (President & CEO)
So you want to take that?
Chris Turner (Head of Investor Relations)
Yeah. Thank you. The only thing I'll add to that associated with it is if you look at the IRP detail you can see what we posted on Monday.
Unknown (Analyst)
What the 2600 megawatts in puts relative to generation assets and what those assets would entail associated with it and the investments associated that would be required in storage and CCG, TS and other mechanisms. But at this point in time, you know we don't have additional detail all to that. Just as Sean said, that would be more of a 2025 activity as Lloyd commented. I will comment that we have run multiple scenarios in that IRP process covering a range of outcomes and opportunities, including an upside case associated with A6000 megawatts. But again, you can see from the materials sort of what that could potentially entail associated with assets. Yeah, got it. But no, no, at this time, no, no specific views on percent palatable to own.
Lloyd Yates (President & CEO)
No, no, not at this time.
Unknown (Analyst)
Excellent. All right, guys. Thank you very much. We'll see you soon. Nicely done.
Lloyd Yates (President & CEO)
Thanks.
Jeannie (Operator)
Your next question comes from the line of Richard Sunderland with JP Morgan. Please go ahead.
Unknown (Analyst)
Hey, good morning and and thank you for the time today. Maybe I'll just pick up on what Julian was asking on just now. Again, the the 2.6 gigawatts in the load scenarios in the IRP, I think that's really clear. But if you showed with Templeton, you've also done a lot of work on generation that's outside of this kind of data center load opportunity that we're all focused on. I'm curious what type of generation you might need in the IRP regardless of if that data center load shows up or not. And maybe just the sort of generation needs overall, given you've done a lot of this work to convert PPA projects into company owned projects, kind of how you think about that bucket broadly going forward? Yeah, I'd be happy to talk about that more. So when you look at what we've done, just hitting on one of the points you made, we have done a lot of work associated with the generation assets, which are very beneficial relative to customers and all stakeholders and shareholders associated with it. We will continue to do work like that to make sure we're maximizing the opportunities and the benefits to all parties. And so we are, you know, we're excited about the opportunity associated with Templeton should it be approved by the Commission. When you look at the IRP and the elements going forward, in pretty much all cases, especially given the DLOL rules from MISO, you need storage and you need between 500 megawatts and a GW of storage associated with it. And that's to help, you know, address those different accreditation methodology from MISO and the impacts of them. At the same time, dispatchable resources, we've all known that dispatchable resources will be necessary. Batteries help with that. But at the same time you also are going to need additional spinning assets such as gas turbines or peakers. You see that when you look at those scenarios. Regardless of data centers, you need more dispatchable resources that will show up and most likely the form of gas generation. I will emphasize with that we are still focused on our 2040 and we, you know, goal. We continue to work through those even though we make sure that we're doing our interim goals associated with it in the most customer beneficial way. But you can just see from those or what those potential assets look like in the near term. Even though I will say as you look at that, most of those assets would be in the sort of as you're looking beyond the 2029 kind of time frame associated with it. So not as much in the next couple of years as Sean highlighted. And then it obviously the resource plan goes significantly further out, which then there's a significantly more resource potential addition that you move through time with EPA rules. Great. Thank you for the color there. And then again, kind of zooming out here on the data center opportunity, I realized there's a lot more work and you've been clear on some of the commercial efforts. But going back to the summer with that big Microsoft project announcement, I'm curious if you could say anything more on that front. Is that given that's out there, it says something closer along to getting firmed up and added to either your base or your upside plan and anything else you could say there about kind of the work going forward on that?
Lloyd Yates (President & CEO)
You know, the point is, I think all these data center, the activity and the associated work with the counterpart is primarily a 2025 activity. And you know, Microsoft did announce that last year, but I think the timetable we're on is 2025.
Unknown (Analyst)
Got it. Clear enough. Thank you very much.
Jeannie (Operator)
Your next question comes from the line of Bogus Chopra with Evercore ISI. Please go ahead.
Unknown (Analyst)
Hey team, Good morning. Thanks for giving me time. Just first quick clarification is Stumbleton Wind. I just want to be clear on this. That's in the base plan. Is that correct?
Lloyd Yates (President & CEO)
Yes, we just move that from the upside to the base plan.
Unknown (Analyst)
OK, perfect. Thank you. And then maybe Sean, I know you kind of talk to the equity staying the same, but it's a substantial increase in the capital plan versus 5 or five years like close to 20% and you you talked about 81% I believe was the number that you called out getting recovery in the zero to six months. Is it just that that with this, you know, even with this capital increase, you don't have to issue any more equity or is this more regulatory filing perhaps an improvement in our OE, maybe just a little bit more color around around that front would be helpful.
Jeannie (Operator)
Yeah, sure. Appreciate it there. You guys shot a more efficient capital allocation which minimizes regulatory lag that that's really the key and it supports a higher cash flow from operations which we're seeing across our systems, maybe about 10% over the course of the plan horizon. That's helping to contribute to a more efficient financing structure. But again, I know you know, we worked ahead here in 2024 on credit quality both in terms of outperforming our financial projections in the current year. And utilizing the junior sub marketplace for a billion dollars of funding, which were not initially in the plan. So we've already made some of this progress to date and we're we're capitalizing on some of that benefit also.
Unknown (Analyst)
Got it. So you have some breathing room to to start with. OK, final question just on a flat O&M you've you've had this guidance for for a few years now. So maybe just you know how you're thinking through that. I understand obviously there's a large increase in the capital program with that comes higher operating expenses, well, I would assume, but generally growth in the business and inflation has come down, but it's still there. Just how are you thinking what's the conference level and sort of extending that flat O&M as we go to sort of latter years of your financial plans?
Lloyd Yates (President & CEO)
So Dagesh, you know, I mentioned in the values safer, better, you know, faster, more efficient and for lower cost. And I think there's a lot more opportunity at nice source to drive those values through the organization. You know, we talked about a working asset management process and using AI to to improve our scheduling efficiency. So our hands on time and our workforce is going up and we're just getting more done with the people we have. And I think we look at the foreseeable future. I do see continue to see flat OO and M Project Apollo is, you know, in in its second year and there's just a whole lot more opportunities. So we we see being flat for the foreseeable future by being more effective and more efficient.
Unknown (Analyst)
It's very clear. Congrats, guys. Thank you.
Jeannie (Operator)
Your next question comes from the line of Ross Fowler with Bank of America. Please go ahead.
Unknown (Analyst)
Morning, Lloyd. Morning, Michael. Morning, Sean. How are you?
Lloyd Yates (President & CEO)
Good morning. Good morning.
Unknown (Analyst)
So you mentioned sort of ISO capacity in the in the prepared remarks. So I just wanted to dig into that a little bit. Clearly they've adopted some of the constructs for the next auction that PJM also has. And so you know, we saw what happened in PJM with higher capacity prices. We saw sort of what the what the feedback there has been. I guess a couple questions related to that. Do you feel like the IRP and the rate case and sort of the vertically integrated model in Indiana allow you to get that conversation going with the regulator, get in front of what we might see for an auction result next spring? And then in the context of the IRP, you know, you talked about data centers and sort of the demand being a 2025 kind of thing. What do you think about the risks of timing related to the demand coming in over time, right? Because it still takes time to build the data center and the ability to sort of build dispatchable generation, which we're hearing takes sort of four, 5-6 years by the time you get the permitting and the turbine and that sort of thing. So maybe contextualize? It.
Lloyd Yates (President & CEO)
Let me start that I might weigh in. You know, you think about NIPSCO, you know where we serve electricity. Even though we're part of MISO, we continue to be a vertically integrated utility responsible for generation, transmission and distribution. I think the MISO model gives us a competitive advantage in terms of speed to market to facilitate some of this data center load. I think with respect to the speed the data center load load grows or below demand, I think that's part of the conversation or the activity for 2025, you know, but what pace can we build it and can we build to match the demand of those data center loads as part of the conversations that we're having that will go into 2025, Michael, anything after that?
Unknown (Analyst)
And the only things I would add is when we go through the IRP process, it includes stakeholders across it. So those conversations relative to my SO accreditation, the scenarios around it, the EPA requirements which may require carbon sequestration and storage have already been gone. So we've been having those conversations with stakeholders now and introducing that what the impacts of that would be. And also with that means some potential portfolios. The only thing I would highlight roll to the data centers in addition is that we are working through those activities and I would just say we are well aware of the demand requirements.
Chris Turner (Head of Investor Relations)
Of the entities.
Unknown (Analyst)
Associated with what they would want to do. So as we work through it in a methodical and disciplined fashion, I would also say we're working through what it takes to meet that demand in a methodical and disciplined fashion to satisfy our customer needs. And then I guess on the capacity auction, if you do get a high capacity clear, which you've already kind of seen inventory in, in my. So I know you're a different zone, but given the rules they've adopted with the VR curve etcetera. Do you worry about that in in conjunction with your regulators? And does that eat into a little bit of bill headroom or how, how should I think about that? Should we be going the same capacity price direction in my SO that we've seen in PJM? My comment to that would be and then others can jump in and associate with it. My comment to that would be. That's one of the reasons the vertically integrated model is so beneficial. Associate with it.
Chris Turner (Head of Investor Relations)
Because we have requirements.
Unknown (Analyst)
And whatever is brought to bear that we have to provide for the reserve margin on top of that as well as what's associated with the accreditation reduction. So I would say fundamentally supply demand, we're helping to keep that supply demand in balance associated by what we're doing and what we're looking at would be required in resource additions, which is also why we included the case, the reference case with 2600 megawatts of potential, you know large load like data centers and the scenario upside. So though we are always cognizant of that and focus on what the impact of customers in, I would also say that vertically integrated model helps mitigate a lot of that risk. OK. Thank you for that.
Jeannie (Operator)
Your next question comes from the line of Travis Miller with Morningstar. Please go ahead.
Unknown (Analyst)
Hello everyone, thank you.
Lloyd Yates (President & CEO)
Morning.
Unknown (Analyst)
Go figure. Another data center question, and perhaps this is just a clarification and clarification of all the clarifications you've given. But do you, do you technically need to build anything, put infrastructure in the ground to allow power to flow to that Microsoft Center initially and then maybe one or two others, That's more of a technical question, right? Do you actually need to build anything in the short term to get these first couple data centers online?
Lloyd Yates (President & CEO)
Yes, we we would need to build to facilitate the kind of little demand we're talking about, whether it's Microsoft or any other counterparty.
Unknown (Analyst)
OK. And is that more generation or transmission for the first for the Microsoft Center and and maybe one or two?
Lloyd Yates (President & CEO)
Others the the most of these investments would require both generation and transmission.
Unknown (Analyst)
The only thing I would add associated with that though is is mentioned before, we do have a very beneficial territory associated with that from what we have and you know transmission capability, capacity as well as we have great sites associated with that generation. But when you look at the demand associated with all these entities, you, you are going to have to add additional resources and additional infrastructure in order to meet the high load factor and high reliability demand of those entities. OK, so literally the Microsoft Center that was announced can't come online until you build new generation or new transmission, however that works out. I wouldn't infer that from it. I would just infer that when you're talking about adding, you know, significant scale associated with the system, you have to make sure that you're meeting the reserve margins and reliability requirements. You know, saying that they can't come online without any of that in place, I would say would be sort of, you know, going a step too far associated with it. OK, got it. And then on the different topic, gas demand, what are you seeing right now in terms of gas demands and how much gas demand growth is in your new and extended CapEx plan assumption?
Jeannie (Operator)
Yeah, we're still seeing a a fair amount of growth across our service territory territories, most notably Virginia, Central Ohio continue to grow and continue to extend the system. We're we're still seeing customers close to 1% on a net customer basis. The total number of additions we have minus attrition is is ending at about net 1% for the gas businesses. We continue to see demand from an economic development standpoint for onshoring and for gas pipelines to support electric vehicle battery manufacturers and a few other examples that we have across the service territory. We tend to be a little bit bearish in our forecast as it relates to total customer additions. Economic development and and customer growth can be hard to predict. Therefore, we tend to to mute what the forecast looks across the horizon for total customer count growth, but we're continuing to see close to that 1% on a trailing 12 month basis.
Unknown (Analyst)
OK, great. I appreciate all the thoughts.
Jeannie (Operator)
Your next question comes from the line of Gabe Maureen with Mizuho Security. Please go ahead.
Unknown (Analyst)
Hey, good morning, everyone. Just following up on the last question around gas, Can you just maybe give a little more color on the step change within Columbia CapEx? Are you accelerating work here? Is it costing more? Are there any discrete projects with various jurisdictions you point to? And then sort of as a second part to that, can you just talk about to what extent any changes in the gas forward curve which has come down since the last five year plan may or may not have played into the CapEx increase as well as the ability to keep customer bills 5% or lower? Thanks.
Jeannie (Operator)
Yeah, you bet, Gabe. Appreciate the question. So the gas system hardening work that we're seeing, I don't know if I'd necessarily call it a step change so much as a glide into what the requirements will be for the completion of the bare steel replacement programs. Placement programs are starting to pop up as well. We do have some gas AMI investment which we've been focused on and we would like to continue. We think that drives great efficiency and better service for our customers. So there is some of that included as well. But IOI and inline inspection work continues as well as some transmission compliance. We expect that some films of rulemaking as well in the new year could give better indications on timelines associated with the compliance requirements for leak detection rules. So there's a whole host of things for us to do to help pardon the gas system and that's what you're seeing in the capital allocation itself. And then in terms of the forward look gas curve, the average, average cost for gas right now across our service territory is about $2.20. We've used the Nymex curve in this forecast, which increases that by 43% next year, an additional 12% in the subsequent year. So it already reflects a pretty healthy step up in gas costs that's included inside that fuel that we've projected across the horizon. Great.
Unknown (Analyst)
Thanks, John. Your next question comes from the line of.
Jeannie (Operator)
Ryan Levine with Citi. Please go ahead.
Unknown (Analyst)
Good morning. Has that been or are there any steps?
Lloyd Yates (President & CEO)
That have been.
Unknown (Analyst)
Taken for a nice service or NIPSCO to enter the queue for critical gas generation infrastructure that could help accelerate the time to market for your customers.
Lloyd Yates (President & CEO)
Yeah, I wouldn't get into those specific details.
Unknown (Analyst)
Associated with what we've done on those activities based you know as we're going through the commercial discussions, I will just say that we have been appropriately planning associated with what's needed just as the previous question was asking relative because there's any infrastructure required. All of all these facilities require some level of infrastructure whether it be substation, transmission generation etcetera. But we have been, we're appropriately aware and have been calibrated to that and have been of positioning ourselves effectively. Yeah. But one of the advantages of.
Lloyd Yates (President & CEO)
NIPSCO is our proximity to the gas supplies to the Utica and Marcellus Shields. So I, I think as you look at these opportunities, I mean we've mentioned earlier proximity of robust transmission, electric transmission system and proximity to you know, gas, gas supply are just critical advantages for the company. And and I will add one more thing to that we.
Unknown (Analyst)
Are seeing that gas benefit and that gas benefit across territories in more than just Indiana. We see it in other of our territories because it's very beneficial relative to not only the onshoring, but also for data center activities and other areas as they look of how to address potential power shortfalls in other areas. Maybe a follow up given.
Lloyd Yates (President & CEO)
Maybe increased demand?
Unknown (Analyst)
For this type. Of infrastructure, how much of your new CapEx guidance change is associated with items previously in the plan costing more? First, additional items being added to the CapEx plan.
Jeannie (Operator)
Hey, Ryan. I don't think we have that exact calc on what's an inflationary increase versus a change in compliance requirement, regulation requirement or what's necessary for us to deliver reliability for our customers. So we wouldn't be able to parse it down. But I think that the thematic answer is that additional work, not the cost of the same work is what's driving the cost the the direction it's headed. And we just continue to see the cost of compliance and regulation to increase, whether that's coming from EPA, whether that's coming from ISO and FERC, whether that continues to come from films, it is really the driver of the capital allocation increase. Thank you. Thanks, Brian. That concludes our Q&A session. I will now turn the conference back over to Lloyd Yates, CEO for closing remarks. Thank you for your.
Unknown (Analyst)
Interest and thank you for your questions.
Lloyd Yates (President & CEO)
Today, thank you for your interest in nice Source and we look forward to seeing all of you at the EEI financial Conference in a couple of weeks.
Jeannie (Operator)
This concludes today's call. Thank you for joining. You may now disconnect.
Other transcripts: Q2 FY26 transcript · Q1 FY26 transcript · Q4 FY25 transcript · Q3 FY25 transcript · Q1 FY25 transcript · Q4 FY24 transcript
All NI earnings · Back to NI overview
Transcript produced by Signals.AI from the company's own earnings call audio; speech recognition can mishear a word. Not personalized investment advice.