| 2026-08-06 | 10-Q | 10-Q filed 2026-08-06 by ECOLAB INC. |
| 2026-07-28 | 8-K | 8-K filed 2026-07-28 by ECOLAB INC. |
| 2026-05-29 | 8-K | 8-K filed 2026-05-29 by ECOLAB INC. |
| 2026-05-11 | 8-K | 8-K filed 2026-05-11 by ECOLAB INC. |
| 2026-05-07 | 10-Q | 10-Q filed 2026-05-07 by ECOLAB INC. |
| 2026-04-28 | 8-K | 8-K filed 2026-04-28 by ECOLAB INC. |
| 2026-04-15 | 8-K | 8-K filed 2026-04-15 by ECOLAB INC. |
| 2026-03-27 | 8-K | 8-K filed 2026-03-27 by ECOLAB INC. |
| 2026-03-20 | 8-K | 8-K filed 2026-03-20 by ECOLAB INC. |
| 2026-03-20 | DEF 14A | DEF 14A filed 2026-03-20 by ECOLAB INC. |
| 2026-02-25 | 8-K | 8-K filed 2026-02-25 by ECOLAB INC. |
| 2026-02-23 | 8-K | 8-K filed 2026-02-23 by ECOLAB INC. |
| 2026-02-23 | 10-K | 10-K filed 2026-02-23 by ECOLAB INC. |
| 2026-02-10 | 8-K | 8-K filed 2026-02-10 by ECOLAB INC. |
| 2025-10-30 | 10-Q | 10-Q filed 2025-10-30 by ECOLAB INC. |
| 2025-10-28 | 8-K | 8-K filed 2025-10-28 by ECOLAB INC. |
| 2025-08-27 | 8-K | 8-K filed 2025-08-27 by ECOLAB INC. |
| 2025-08-07 | 10-Q | 10-Q filed 2025-08-07 by ECOLAB INC. |
| 2025-08-06 | 8-K | 8-K filed 2025-08-06 by ECOLAB INC. |
| 2025-07-29 | 8-K | 8-K filed 2025-07-29 by ECOLAB INC. |
| 2025-07-18 | 8-K | 8-K filed 2025-07-18 by ECOLAB INC. |
| 2025-06-05 | 8-K | 8-K filed 2025-06-05 by ECOLAB INC. |
| 2025-05-09 | 8-K | 8-K filed 2025-05-09 by ECOLAB INC. |
| 2025-05-09 | 8-K/A | 8-K/A filed 2025-05-09 by ECOLAB INC. |
| 2025-05-08 | 10-Q | 10-Q filed 2025-05-08 by ECOLAB INC. |
| 2025-04-29 | 8-K | 8-K filed 2025-04-29 by ECOLAB INC. |
| 2025-03-28 | 8-K | 8-K filed 2025-03-28 by ECOLAB INC. |
| 2025-03-28 | 8-K | 8-K filed 2025-03-28 by ECOLAB INC. |
| 2025-03-24 | DEF 14A | DEF 14A filed 2025-03-24 by ECOLAB INC. |
| 2025-02-21 | 10-K | 10-K filed 2025-02-21 by ECOLAB INC. |